Core Documents

Network Rail

NR01  Application
NR02  Draft Network Rail (Cambridgeshire Level Crossing Reduction) Order 
NR03  Explanatory Memorandum 
NR04  Statement of Aims 
NR05  Statement of Consultation
NR06  Funding Statement
NR07  Estimate of Costs
NR08  Order plans and sections
NR09  Book of Reference 
NR10  Planning Statement, which provides a description of the scope and purpose of the Application in relation to relevant legislative requirements, and planning policy 
NR11  Screening Decision Letter, which confirms that under the EIA Regulations the scheme has been deemed as having no significant impact on the environment and therefore does not require an Environmental Statement 
NR12  Design Guide which outlines the design proposal principles and components, including drawings for each level crossing
NR13  Management of Health and Safety at Work Regulations 1999 (tab 1)
NR14  ORR: Strategy for regulation of health and safety risks – 4: Level crossings (tab 2) 
NR15  ORR: Periodic Review 2013: Final determination of Network Rail’s output 
funding for 2014–19. Extracts relevant to level crossings (tab 3)

NR16  Road Safety Audits for Cambridgeshire (tab 4)
NR17  Transforming Level Crossings 2015–2040 (tab 5) 
NR18  Client Requirements Document Anglia CP5 Level Crossing Reduction Strategy (tab 6) 
NR19  CP5 Level Crossing Risk Reduction Fund Criteria, Governance and Reporting (tab 7) 
NR20  Network Rail Standard NR/L1/XNG/100: Level crossing asset management policy (tab 8) 
NR21  Network Rail Standard NR/L2/SIG/19608: Level crossing asset inspection and implementation of minimum actions codes (tab 9) 
NR22 Network Rail Operations Manual NR_L3_OCS_041_5-16: Risk Assessing Level Crossings (tab 10) 
NR23 Network Rail Level Crossing Guidance 01: Completion of Site Visit and Census Forms (tab 11) 
NR24  Anglia Route Study (March 2016) (tab 12)
NR25 Censuses of Cambridgeshire sites (tab 13)
NR26 Network Rail Statement of Case
 

Cambridgeshire County Council

Bundle 1

1 Chronology of events
2 Summary of Cambridgeshire County Council position 31.10.2017
3 CCC response to first public consultation 7th July 2016
4 Objection to C23, C24 Ely proposals – A Churchard 08.07.2016
5 South Cambridgeshire District Council response to Mott MacDonald re relevant planning policies 25.07.2016
6 ECDC response to NR_policies
7 FDC response to Network Rail's proposed level crossing closures - July 2
8 CCC complaint to Tracsis over late notification and inadequacy of traffic census 2016.06.07  
9 Traffic census rationale received from Mott MacDonald 20.06.2016
10 CCC letter to Mott MacDonald regarding concerns over the traffic census methodology and purpose 15.07.2016
11 CCC email to Mott MacDonald concerning additional censuses required 22.07.2016
12 Email correspondence CCC- Mott MacDonald re additional traffic surveys 28.09 and 03.10.2016
13 Mott MacDonald response regarding traffic census methodology 14.03.2017
14 Cambridgeshire County Council Business Plan 2017-18, Section 1 only
15 Highway Infrastructure Asset Management Plan (HIAMP) - contact Programme Officer
16 Local Transport Plan 3 (LTP3) and Long Term Transport Strategy
17 Rights of Way Improvement Plan (ROWIP) - contact Programme Officer
18 Health & Wellbeing Strategy 2017-18
19 CCC Diversion Policy and Guidance
20 Network Rail letter to the Ramblers’ Association on 15th  November 2016 
21 Adoption of NMU routes scoring by proposal
22 Photographs showing existing routes and proposed routes  for proposals to which CCC objects
23 Table of PROW statistics for Cambridgeshire
24 Cambridgeshire Definitive Map Extracts
25 Cambridgeshire Table of Definitive Statements by path and crossing
26 Cambridgeshire County Council List of Streets 01.11.2017
27 Large County-wide composite Highway & PROW Maps
28 Diversion Order-style plans
29 CCC email 11.08.2017 raising concerns about location of Public inquiry 
30 Table analysing additional lengths
31 Comparison of Definitive Map With TWAO Plans summary
32 Comparison of Definitive Map with TWAO Plans detail
33 Comparison of Definitive Map With TWAO Plans APPENDICES
34 NR Crossing Risk Summary
35 Mott MacDonald response 03.10.2017 regarding flood data
36 Environment Agency Flood Information
37 Littleport FP11 2004 Public Inquiry Inspector’s Report
38 CCC-NR email exchanges regarding status of Poplar Drove 08.07.2016
39 Poplar Drove Highway handover map 1930
40 Highway handover maps Isle of Ely_Key
41 Extract from 1910 Finance Act Map – Poplar Drove
42 BS5709 Gaps Gates Stiles Specification
43 PROW Network Maps
44 Bishops’ Way Leaflet
45 Hereward Way Leaflet
46 Cawdle Fen Walk Leaflet 
 

Bundle 2

1   CCC response to NR Consultation July 2016
2   CCC HCI Committee paper Dec16
2 1  2016.12.07 HCI Committee report_ALARCS
2 2  Appendix 1_Background Information
2 3  Appendix 2_CCC 2016 July Consultation Response
2 4  Appendix 3_CCC Letter to Network Rail_DIA
2 5  Appendix 4_CCC Position Summary
2 6  Appendix 5_CCC Position Detail
2 7  2017.12.07 HCI Minutes
3   CCC HCI Committee Jan 17
3 1  2017.01.17 Committee report_ALARCS
3 2  Appendix 1_20161207 HCI Committee report
3 3  Appendix 2_Summary of CCC Position V2
3 4  2017.01.17 HCI Minutes
4   CCC HCI Committee Feb 17
4 1  2017.02.21 HCI Committee report_ALARCS
4 2  Appendix 1_Background Information
4 3  Appendix 2 - TWA tests
4 4  Appendix 3 - Map showing proposals C20 Leonards
4 5  Appendix 4_CCC Position Summary
4 6  2017.02.21 HCI Minutes
5   2017.03.21 CCC formal response pre-TWAO
6   CCC Holding Objection to TWAO 19.04.2017
6 1  2017.04.19 SoS_TWAO_Holding response
6 2  2017.03.21 Response to NR_Pre-TWAO
6 3  2017.05.02 CCC to DfT_full Appendix
6 4  CCC Position Summary 19.04.2017
6 5  2017.04.19 Copy of holding response to NR
6 6  2017.05.19 NR acknowledgment
7   CCC Response to draft TWAO_HCI Cttee
7 1  HCI Committee report 11.07.2017
7 2  Appendices 1 and 2 are at Tab 4(1) and 4(2) above
7 3  Appendix 3 SoS_Holding response 20170419
7 4  Appendix 4 CCC Proposed Full Response
7 5  Doc A PPO Policy 2010
7 6  Doc B Ramblers Letter  24.11.16
7 7  Doc C CCC response_EIA
8   CCC Response to TWAO_Council
8 1  Cambridge News Notice 28 06 17
8 2  Fenland Citizen Notice 28.06.17
8 3  Ely Standard Notice 29.06.17
8 4  Newmarket Journal Notice 9.06.2017
8 5  Royston Crow Notice 29.06.17
8 6  Agenda_Council Meeting 18.07.2017
8 7  Full Council Minutes 18.07.2017
8 8  Amendment to Full Response 28.07.2017
8 9  Letter to DfT_CCC full response 28.07.2017
9   Formal amendment to CCC position 02.11.2017  
 

We use cookies to help provide you with the best possible online experience.
By using this site, you agree that we may store and access cookies on your device.
You can find out more and set your own preferences here.